I have a configuration with a scheduler of for example 5 minutes and the build condition "If changes found in referenced repositories or last build failed".
When I make changes in the repository, the build starts after max 5 minutes. In the QB P4 Repository object, the Change Number (or Label) field is empty.
Now I have added an input field in the configuration where you can enter a perfoce label for the branch. I pass the label name to the field Change number (or label) of the QB P4 repository object. If I now start the configuration and enter an existing P4 label then the files of the label are retrieved. Up to this point, everything is fine.
But, if I now make a change in Perforce after a build on the labelled status, the "normal" build no longer starts automatically! The automatism only works again when I have manually started a "normal" build without a label.
Is this the way it should be?